A major refurbishment programme is underway at the Meyer Werft shipyard, in Germany, where 7600m² of drydock sheet pile walls are being recoated using Steelpaint’s Stelpant corrosion protection system. The work is being carried out by industrial coating contractor Tecton Service.

Located in Papenburg in north-west Germany, Meyer Werft has a history going back to 1795 and has built some of the most significant cruiseships to date in its covered building dock.

Before and after: Steelpaint’s Stelpant system was applied to the drydock’s sheet piles after existing coatings and steel was blasted to Sa 2½.

If you want to read more, become a member!

https://www.fapu.de/plans/membership/